• What does "technical layer" of MORTEX® coating mean ?

    It is a layer of MORTEX COLOR 2-N with a thickness of between 1 mm and 1.5 mm with a minimum drying time of 8 hours and a maximum drying time of 24 hours before the possible application of a subsequent layer.
    Also see FAQ “What are the different Mortex® systems?